Industrial mezzanines in Bergamo, manufactured by us since 1975.
We manufacture 18 km from the city center. Custom mezzanines, including seismic-resistant ones. We conduct the site inspection, we produce the structure, and our technicians oversee the installation.
The MCT plant is located in Mornico al Serio (BG), at Via Bergamo 30. It’s a 15-minute drive from the Seriate highway exit, and just over half an hour from the city of Bergamo. For our customers in the province, this means a site inspection is a morning trip, not a long journey.
Where we are: 18 km from Bergamo, on the SP91.
The plant houses profile cutting and processing, welding lines, powder coating, the warehouse, and the logistics department. The technical office, 200 sq m on the first floor, designs each structure before it goes into production.

In-house production
10,000 sq m in Bergamo, since 1975
In-house technical office
200 sq m, custom solutions
Areas served: Bergamo and Lombardy.
Our primary operational area is Bergamo and its province, extending throughout Lombardy: the fastest response times are in provinces reachable within a day from the Mornico plant.

Lombardy
- Bergamo
- Lecco
- Sondrio
- Brescia
- Milan
- Cremona
- Como
- Monza-Brianza
- Mantua
- Pavia
- Lodi
- Varese
FAQ
Our plant and offices are located in Mornico al Serio (BG), at Via Bergamo 30, approximately 18 km from the center of Bergamo on the SP91: 15 minutes from the Seriate highway exit.
Yes, and generally within 5 days: our technical teams are based locally, not traveling from outside the region. The site inspection is free and without obligation.
Our primary service area is Bergamo and its province, but we serve all of Lombardy and Northern Italy within one day, and the rest of Italy and Europe through our sales network.
We have been manufacturing it in Mornico al Serio since 1975: design, calculation, production, and installation are all handled in-house.
Yes, we prepare the documentation for the SCIA or municipal authorization, as a mezzanine alters the intended use of the space. It is part of the project.
In areas with significant seismicity, we design them according to the seismic criteria of the NTC. We evaluate this during the design phase based on the warehouse’s location.








